History


1955 – Founding
Established in Valencia, State of Carabobo, Venezuela, was organized in 1955 with the support of four companies: Celanese, Firestone, Goodyear, and U.S. Rubber. These companies provided the initial capital.
1958 – First Campus Building
A ten-classroom school was constructed in El Trigal, a residential sector of Valencia. During the 1962-63 school year, a library, four classrooms, showers and dressing rooms.
1968 – High School Building Opens
The High School building was constructed and opened for classes on September 2, 1968. The building consisted of two science laboratories, a computer laboratory, classrooms, a lounge, and offices. The High School library, constructed in 1968 and renovated in 2006.
1980s – Middle School and Cafeteria Added
A “comedor” and Middle School were added during the early 1980s.
1988 – Recreational Facility
A multi-purpose recreational building was completed in August of 1988. Most recently, two annexes, a lower primary building, a second Middle School level, and a maintenance complex were added in the mid-1990s.
2004-2006 – Interactive Nature Trail
Between 2004 and 2006, an Interactive Nature Trail was built behind the Elementary and North Annex buildings. This project includes a Dino Dig, a Tropical Mural, an Aquatic Habitat, Outdoor Classrooms, and a Canopy Tower.
2008-2011 – Mother’s Club
During the 2008–2009 school year, the Mothers Club led a successful campaign to provide new chairs for classrooms across all grade levels. In the summer of 2010, air conditioning units were installed throughout the school.
Recent – Modern Learning Facilities
Most recently, the Joe Houston Walker Cafeteria was enclosed and equipped with climate control, providing a more comfortable environment for students and staff. In addition, a new Education Immersion Center (EIC) was constructed, offering a dynamic space where students engage in complex missions using 21st-century skills and cutting-edge educational technology.
2025 – Auditorium & ERC
During the summer of 2025, the auditorium underwent renovations. An air conditioning system was installed, transforming it into a fully enclosed, climate-controlled space. Additionally, the EIC was converted into the Engineering Robotics Center (ERC), marking a significant upgrade in the school’s facilities.

Educating tomorrow's leaders through academic excellence. Join us on the journey!
About
About Us
Admissions
Employment
Contact
Legal
Terms and Conditions
Cookie policy
Privacy Policy
Code of Conduct
Contact
Avenida Alejo Zuloaga, C/C Calle
El Colegio, Valencia 2001
Phone: +58 241-8526510
Email: admissions@cicvalencia.org
Copyright © 2014 Colegio International de Carabobo | All rights reserved | RIF J-07502558-0 | Registered with the M.P.P.E under No. R-0143-08